The Kalkallo handover walk: what to check before you sign

A practical order for the pre-handover inspection on a new Kalkallo home, from the roof down to the cabinet doors.

Kalkallo 3064 · 2026-09-28

In short: Work from the outside in: roof, wall base, ground, then each room. Write every item down, have the builder acknowledge the list, and agree dates before signing.

Start on the roof

Look for cracked or broken tiles, loose ridge capping and debris in the valleys. From inside the manhole, check sarking, insulation coverage and whether ducts are crimped or hanging loose.

Then the base of the walls

This is where Kalkallo handovers most often fail. Weep holes should sit at least 150mm above the ground, or 75mm on graded sites, and be clear of mortar. Expansion joints and pipe penetrations should be sealed.

The ground around the house

Paths need isolation joints where they meet the slab. Ground should fall away from the house, and stormwater pipes need enough cover.

Inside, room by room

Doors should latch and swing without binding, cabinets should have even gaps, grout and sealant in wet areas should be complete, and paint and plaster should read as one finish in normal light.

Written by our local inspection team from work carried out in Kalkallo. Licensed building practitioners, Building & Plumbing Commission registration CDB-U 53425.

Guides

More pci / handover guides for Kalkallo

All guides →

Book a building inspection in Kalkallo

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Questions Kalkallo owners ask about this

How long should the handover walk take?

With an inspector, two to three hours for most single storey homes.

Should I sign if items are outstanding?

Check your contract, and get the outstanding list acknowledged in writing first.

What tolerance applies to finishes?

The Guide to Standards and Tolerances 2015.

Can you check the fixes?

Yes. A reinspection marks each item fixed or still open.